THE GEIGER DATABASE

SEARCH OPTIONS
Frank Lloyd Wright commissions

CHRONOLOGICAL ORDER

Frank Lloyd Wright lived an exceptionally long and productive professional life. John Geiger was interested in the ebb and flow of architectural commissions in the Wright studio over time. This search shows Wright commissions for given decades and years, though the project dates often imply the completion date for a commission rather than the sometimes lengthy period involved with development of a design. Some entries also refer to drawings made by Wright earlier in his career prior to establishing his own practice.

Frank Lloyd Wright Project Titles for the year 1946

House for Mr. and Mrs. Herman T. Mossberg [South Bend, Indiana] (1946)

Note: The following information concerning this project represents original research and analysis by John Geiger, and is based in his long and detailed study of the Frank Lloyd Wright literature as well as personal contacts with members of the Taliesin Fellowship and architectural historians. In addition, he added his own categories of building type and compositional form, as well as other points of consideration that he deemed important to understanding of the design. As with any primary archival source material, the references and sources of attribution should be consulted where possible to affirm the data provided. Sometimes there is an indication of attribution for which there is no matching footnote recorded. Some understanding of the intended source may be discovered in remaining notes or frequently cited publications which appear in the comment field.

Name of client: Mossberg, Herman T..

Sobriquet or alternative place name: None.

Design Status (as of 2011): Executed.

Occupancy form or use: HOUSING/Residential/Single Family.

Principal building materials: MASONRY/Brick.

Number of drawings for this project detailed in the database: 8.

Drawing Number and Description

4914.004     Two perspectives
4914.009     Elevations
4914.018     Plot plan

Individuals recorded as contributing to project:

Note: Not everyone who contributed to a project may be named; only those whose participation has been confirmed from a source appear above. Occasionally names presented as contributors to a project may seem chronologically anomalous. This usually occurs when an individual prepared drawings for publicity, exhibition, or publication long after the original date of a commission.

Howe, John
Matthews, Peter
Project Coordinator: Howe, John
Preliminary working drawings coordinator: Howe, John
Working drawings coordinator: Howe, John
Structural engineering: Peters, William Wesley
Construction supervision: Howe, John

Notes and References

Comments by John Geiger and/or sources of attribution: None recorded.